Basic Procedures in Short

Building bridge framework with Dentapreg strip always involves several basic procedures repeated in all particular clinical situations:


 

 
1.Measure the length of bridge framework
  2. Remove Dentapreg from the blister and cut it with regular scissors
     
 

3. Peel away the waxed paper and transparent foil   4. Pre-form the bridge framework and light cure it
     
 
5. Remove pre-formed strip and apply hybrid/flow composite to prepararations   6. Insert pre-formed strip to bridge framework
     

 

7. Light cure bridge framework   8. Build up the pontic

 

General Remarks for Working with Dentapreg

  • Dental stone model is a good training tool for trials of Dentapreg
  • Avoid sharp edges and undercuts on the model
  • Before forming Dentapreg strip on a model, always apply separation liquid or wax
  • Always use the widest clinically acceptable Dentapreg strip
  • During forming and adaptation of the Dentapreg strip advance slowly from one end to the other to allow for a good adaptation of the fibrous reinforcement and small flow of the resin to avoid defects and shape memory effect
  • In order to minimize potential damage to the fibers, it is recommended to use plastic instruments for dental filling composites
  • When preparing the strip (measuring, trimming), keep the strip in its original transparent protection foil to avoid contamination
  • Avoid sharp edges and extremely small interproximal curvatures when forming Dentapreg strips to prevent fiber breakage
  • Most commercially available light or dual curing dental adhesives can be used to bond Dentapreg strips
  • Adhere according to the acid etching and adhesive  procedures recommended by the manufacturer of the etching agents and adhesive 
  • Polishing or sand blasting of cured Dentapreg should be avoided, to enhance patient comfort and maintain good hygienic conditions, a layer of light curing hybrid composite can be applied on the Dentapreg surface and polished with standard procedures

Measure the length of bridge framework
Remove Dentapreg from the blister and cut it with regular scissors
Peel back the waxed paper and transparent foil
Pre-form the bridge framework and light cure it
Remove pre-formed strip and apply hybrid/flow composite to preparations
Insert pre-formed strip to bridge framework
Light cure bridge framework
Build up the pontic

top 


  • English
  • Products
  • Fixed Bridges
  • Procedures
  • Basic Procedures in Short